We built a new suspension footbridge leading to Lake Jasna

Visitors of the popular walking trail to Lake Jasna in Kranjska Gora have been able to cross a new suspension footbridge since October, built by the Kaskader team between November last year and June this year. The Lake Jasna area has always been a popular gathering place for both locals and tourists. The new suspension […]
We restored the suspension bridge across the Idrijca River known as “Pri ta debeli skali”

One of the most popular bridges across the Idrijca River is the bridge known as “Pri ta debeli skali” (“At the Big Rock”). Although the exact year of construction of the original bridge is unknown, many locals from Idrija — as well as members of the Kaskader team — remember it from their childhood. That […]
Helicopter transport assisted us in the reconstruction of the power line in Idrija

The Kaskader team is currently restoring the foundations of the RP Idrija – Oblakov Vrh power line. Due to the difficult terrain, we also used helicopter assistance for the concrete works. The foundations of the 20 kV RP Idrija – Oblakov Vrh power line are located in the immediate vicinity of residential buildings in Idrija. […]
Road protection beneath an overhang between Kobarid and Trnovo

On the section between Kobarid and Trnovo, where the road runs alongside the steep cliffs of one of the most scenic yet demanding areas of the Soča Valley, we carried out an extensive slope protection project during 2024 and 2025. The area is constantly exposed to falling rocks, and our work was carried out alongside […]
Demanding slope rehabilitation to ensure safe access to the village of Loje

The local road between Kneža in the Bača Valley and the village of Loje had long been heavily affected by poor geological conditions, which caused erosion and the collapse of larger rock masses. Since temporary solutions were no longer sufficient, we carried out a comprehensive rehabilitation of the cut slope above the public road after […]
Using a cable crane, we restored a suspension footbridge across the Sora River

After the devastating floods of 2023, when the swollen Sora River swept away the existing suspension footbridge between Rateče and Dol, we successfully completed the installation works for its reconstruction, once again enabling safe passage for pedestrians and cyclists. The project, commissioned by the Municipality of Škofja Loka, was carried out as part of a […]
Rehabilitation of the retaining wall on the road to Predil using rope access techniques

On the state road between Bovec and Predil, just beyond the junction leading toward Mangart, we carried out the rehabilitation of a retaining wall. The old stone retaining structure, which had protected the road for many years, was in very poor condition due to weather exposure and constant structural loads. Water had undermined its foundations, […]
Restoration of the Kalvarija Hill above Idrija using a cable crane

This year, extensive restoration works are underway along the Calvary path above the Church of St. Anthony in Idrija, involving the renovation of all 13 stations. Due to the demanding terrain and limited access, we installed a small cable crane system to transport construction materials directly to the worksite. The cable crane operates as needed […]