Jablanca suspension bridge near Bovec is open

This summer, the Kaskader team completed the final works on the new Jablanca suspension bridge near Bovec, one of the longest suspension bridges in the Upper Soča Valley. The bridge is important for both local residents and visitors, as it replaces the old, deteriorated, and damaged footbridge that had been closed for safety reasons. The […]

Water barriers at Krvavec prevented the worst

The flexible water barriers for controlling torrential waters, which we built at Krvavec last year, proved to be extremely effective during this year’s storms. The 16 barriers have gradually filled with material, reducing the channel gradient and preventing a new debris flow from reaching and damaging the cable car area. After the 2018 landslide, the […]

Slope protection in Idrijska Zala among the most extensive projects in Slovenia

The implementation of protective measures against falling rocks and rockfalls in Idrijska Zala is in its final phase. This is one of the most extensive projects of its kind in Slovenia, involving skilled loggers, rope access technicians, mobile crane operators, and helicopter transport teams. The route of the Spodnja Idrija – Godovič state road from […]

We are building a new six-seat chairlift on Velika Planina

The old two-seat chairlift on Velika Planina had reached the end of its service life. This year, it is being replaced by a new, more modern, and safer six-seat chairlift manufactured by Leitner, designed to transport skiers, passengers, and bicycles in both directions. The first visitors are expected to reach the plateau in the first […]

We built a new suspension footbridge leading to Lake Jasna

Visitors of the popular walking trail to Lake Jasna in Kranjska Gora have been able to cross a new suspension footbridge since October, built by the Kaskader team between November last year and June this year. The Lake Jasna area has always been a popular gathering place for both locals and tourists. The new suspension […]

Helicopter transport assisted us in the reconstruction of the power line in Idrija

The Kaskader team is currently restoring the foundations of the RP Idrija – Oblakov Vrh power line. Due to the difficult terrain, we also used helicopter assistance for the concrete works. The foundations of the 20 kV RP Idrija – Oblakov Vrh power line are located in the immediate vicinity of residential buildings in Idrija. […]

Road protection beneath an overhang between Kobarid and Trnovo

On the section between Kobarid and Trnovo, where the road runs alongside the steep cliffs of one of the most scenic yet demanding areas of the Soča Valley, we carried out an extensive slope protection project during 2024 and 2025. The area is constantly exposed to falling rocks, and our work was carried out alongside […]

Demanding slope rehabilitation to ensure safe access to the village of Loje

The local road between Kneža in the Bača Valley and the village of Loje had long been heavily affected by poor geological conditions, which caused erosion and the collapse of larger rock masses. Since temporary solutions were no longer sufficient, we carried out a comprehensive rehabilitation of the cut slope above the public road after […]

Using a cable crane, we restored a suspension footbridge across the Sora River

After the devastating floods of 2023, when the swollen Sora River swept away the existing suspension footbridge between Rateče and Dol, we successfully completed the installation works for its reconstruction, once again enabling safe passage for pedestrians and cyclists. The project, commissioned by the Municipality of Škofja Loka, was carried out as part of a […]